The Bell Consultants provide free technical support to local ringing bands and to the PCCs. Support ranges from inspection, reporting and making recommendations on technical aspects of existing bell installations to assisting PCCs in applications for Faculties for new bell installation projects. The Bell Consultants are fully qualified mechanical engineers and their out of pocket expenses are met by the Association’s Bell Repair Fund to which many PCCs in the Diocese are affiliated by paying an annual donation.

A summary of work carried out is published every year in the Annual Report. Listed below is a sample of their reports with older reports, such as the old bell frame at Stanton in Peak, included for historical reasons.

All requests for inspections and advice should be in writing with the authority of the PCC. For further information, please contact the Bell Consultants - or

Bell Consultants Reports
Location Inspection Date Comments
Alfreton December 05
Alvaston Feburary 06
Bakewell July 03
Barrow on Trent November 02
Baslow May 06
Beeley March 95
Blackwell November 06
Bonsall April 04 Inspection of old bells (April 01).Record of old bells (August 03)
Bradbourne December 98
Brailsford July 03 Improvement of rope circle
Brassington January 02
Breadsall June 07 New report Feb 08
Brimington November 99 Ring of one steel bell with two sanctus bells
Burbage September 04 July 96
Calow December 06 Carillon of eight bells hung 'dead'
Cotmanhay January 07 Single bell
Derby, St Luke July 93
Derby, St Peter December 07 Sound control proposal - New report Feb 08
Egginton July 03 Feasibility study for augmentation to five bells
Findern August 02 Two bell tower, with feasibility to restore & augment (September 02)
Glossop September 04
Great Longstone December 06 Bell Improvement Proposal
Grindleford Feburary 99 Single bell
Hartington April 99 Feasibility Report for augmentation to 8. Both Frame locations
Hathersage August 06
Hayfield June 05
Heath March 03
Horsley December 98
Idridgehay October 05 Single bell
Ilkeston Feburary 93
Kirk Ireton April 93 Three bells with Sanctus
Matlock December 93
Melbourne Feburary 94 In connection with the then proposed augmentation to 12
Mickleover May 03 Three chiming bells
Mugginton September 03 Analysis of bell dynamic characteristics
Norbury March 03 August 99
Old Brampton August 05 November 94
Quarndon September 04 Single bell
Radbourne January 05
Riddings June 06 New report Feb 08
Sandiacre March 07 New report Feb 08
Sawley November 92
Shirland August 07 New report Feb 08
Stanton by Dale March 93 With review to implement a ringers' gallery
Stanton in the Peak 1999 Feasibility report to augment to 6 with documentation of the Old Frame (2001)
Tissington July 99
Twyford March 03
Walton on Trent January 03 November 92
Whaley Bridge October 07 Proposal for a new ring of bells. New report Feb 08
Whitfield June 05
Wingerworth October 05
Wirksworth June 05
Youlgreave July 07 Sound control New report Feb 08